
Installation procedure
4
PRIOR TO THE INSTALLATION
9 Perform a complete analysis of the needs for each of the main functions
(security, temperature, heating/cooling and lighting control);
9 Read carefully and keep close to you the technical notice and instruction sheet of all
products to be installed with the system;
9 Set up a complete and detailed wiring layout;
9 If CARDIO is to be hooked up to a central monitoring station, make sure that this provider
accepts one of the two protocols available (see p.11);
9 Make sure to get a double power supply outlet near the installation dedicated to CARDIO and
the X-10 TW523 module (if needed).
SUGGESTIONS
¾ Do not discard the specification and instruction sheets of any installed products
¾ Keep a layout of the installation and a list of all installed items
¾ Keep a copy of the programming
¾ Keep a note of the system passwords for future reference
¾ For more complex installation ( ex. with many lighting channels) keep a detailed listing of all
equipments installed with channels and buttons location etc.
For future reference, we suggest that you write down the following information’s:
CUSTOMER NAME: ____________________________________________
SYSTEM SERIAL NUMBER: ______________________________________
SYSTEM VERSION: ___________________________________________
INSTALLER PASSWORD: ________________________________________
Kommentare zu diesen Handbüchern